Restoration Project

breathing new life

Presented by ginge


Pictures


out of th barnout of th barnthe tear downthe tear downengine still with great compressionengine still with great compression

Restoration Journal

Work completed, time invested, expenses, and lessons learned.

tear down

Started 2014-03-25 กค Finished 2014-03-25
Hours spent3.0
Recorded cost$0.00
Work performed / notes

3 hours to tear it down with no real suprises. A few seized bolts and case screws, pobably replace all of them anyhow some look a little worse for wear. Chrome all needs to de dipped again. Front brake and clutch lavers and casing will need to be replaced. All spoks on rimms need to be replaced. Rear mud guard missing aswell as chain guard. Took the dust cover off the throttle body all looks good. Fuel and oil lines need replacing. Coil pack needs replacing. Head light and instrament cluster in great condition. Indicators all but 1 in good condition. Will definatly be a bare metal respray.

1 work entry3.0 total hours$0.00 recorded costs

To Do Entries

Total Cost: $0.00    Total Hours: 3


Parts Wanted
Name
Category
Desired Cost
Date Entered
Part Description