Restoration Project

 


breathing new life

Presented by ginge


Pictures


out of th barn   2014-04-09 05:05:14 the tear down   2014-04-09 05:08:11 engine still with great compression   2014-04-09 05:10:58

Log Entries


Work Start Date: 2014-03-25  Work End Date 2014-03-25
Title: tear downHours: 3 Cost: $0.00
Work Descrption: 3 hours to tear it down with no real suprises. A few seized bolts and case screws, pobably replace all of them anyhow some look a little worse for wear. Chrome all needs to de dipped again. Front brake and clutch lavers and casing will need to be replaced. All spoks on rimms need to be replaced. Rear mud guard missing aswell as chain guard. Took the dust cover off the throttle body all looks good. Fuel and oil lines need replacing. Coil pack needs replacing. Head light and instrament cluster in great condition. Indicators all but 1 in good condition. Will definatly be a bare metal respray.

To Do Entries

Total Cost: $0.00    Total Hours: 3


Parts Wanted
Name
Category
Desired Cost
Date Entered
Part Description

Parts Purchased
Name
Category
Cost
Date Entered
Part Description

Total Cost: $0.00